  bullet green arrow 25 Must utilize risk analysis (such as FMEA) to assess risks in the rework process prior to rework

bullet green arrow 25Obtain approval, if required by customer, before rework

bullet green arrow 25Documented process for rework confirmation – reference the control plan

bullet green arrow 25Instructions for disassembly, rework, re-inspections & traceability requirements shall be accessible

bullet green arrow 25Records of disposition of reworked product for above items


   