Members

Member Login, or Become a Member

New-Arrow-Left-Approximately
  Document, and review mfg. process design input requirements including but not limited to:

bullet green arrow 25
product design output data including special characteristics

bullet green arrow 25targets for productivity, process capability, timing, and cost

bullet green arrow 25manufacturing technology alternatives

bullet green arrow 25customer requirements, if any

bullet green arrow 25experience from previous developments

bullet green arrow 25new materials

bullet green arrow 25product handling and ergonomic requirements

bullet green arrow 25design for manufacturing and design for assembly.


   
ASR Logo v-small