Members

Member Login, or Become a Member

New-Arrow-Left-Approximately
  bullet green arrow 25 Revisions following engineering changes

bullet green arrow 25Out-of-specification readings as received for calibration/verification;

bullet green arrow 25Assessment of the risk of the intended use of the product caused by the out-of-specification condition;

bullet green arrow 25M&TE with “AS-Found: calibration data out of tolerance – records of evaluation of previous measurement results

bullet green arrow 25Notification to the customer if suspect product or material has been shipped;

bullet green arrow 25statements of conformity to specification after calibration/verification;

bullet green arrow 25verification that the software version used for product and process control is as specified;

bullet green arrow 25records of the calibration and maintenance activities for all gauging (including employee-owned equipment, customer-owned equipment, or on-site supplier-owned equipment);

bullet green arrow 25production-related software verification used for product and process control


   
ASR Logo v-small